LastBlueTape
Residential 23 items ~69 min

New Construction Final Walkthrough

Complete walkthrough checklist for new home construction covering structure, mechanical systems, exterior, interior finishes, and safety items.

What's included

  1. 1 Inspect exterior siding and trim for damage
  2. 2 Check all windows open, close, and lock
  3. 3 Verify exterior doors seal properly — no daylight gaps
  4. 4 Test garage door opener and safety reverse
  5. 5 Inspect driveway and walkways for cracks
  6. 6 Confirm grading slopes away from foundation
  7. 7 Test all light switches and ceiling fixtures
  8. 8 Verify every outlet works (use outlet tester)
  9. 9 Test HVAC — heating and cooling modes
  10. 10 Check thermostat programming and wifi setup
  11. 11 Run water at every faucet — check for leaks
  12. 12 Flush every toilet
  13. 13 Test water heater — confirm hot water at all fixtures
  14. 14 Inspect attic insulation and ventilation
  15. 15 Check interior doors for proper swing and latch
  16. 16 Inspect flooring for scratches, gaps, or defects
  17. 17 Verify countertops have no chips or cracks
  18. 18 Test smoke and CO detectors on each level
  19. 19 Confirm all appliances received and operational
  20. 20 Inspect paint and drywall for blemishes
  21. 21 Verify cabinet and closet doors operate
  22. 22 Check stair railings are secure
  23. 23 Collect all manuals, warranties, and spare keys

Ready to start?

Create your punch list from this template in seconds. Share with your team, track progress, and get it done.

Use This Template — Free

← Browse all templates